Orangeburg Loop

Project Description

The Orangeburg Loop Project proposes to widen and improve associated intersections on Orangeburg Road (from Dorchester Road to Yerby Road), Mallard Road (from Orangeburg Road to Highway 78), and Jedburg Road (from Highway 78 to the Berkeley County Line) to reduce traffic congestion, improve safety, and accommodate bicyclists and pedestrians. The approximate eight miles of roadway is proposed to be widened to two travel lanes in each direction with a center turn lane or landscaped median. 

Project Announcements

Public Meeting

The blue outline on the map indicates the general vicinity for the transportation project. The boundary is for informational purposes only and does NOT indicate property impacts.

Proposed Road Section

Orangeburg 3 lane.jpg

Orangeburg 5 lane..jpg

Dashboard

The embedded Power BI Dashboards can be viewed in full screen by clicking the arrow  on the bottom right of the BI Dashboard.  Press ESC to exit full screen and return to the Home page. 

Project Announcements

DORCHESTER COUNTY NOTICE OF PUBLIC MEETINGS: ORANGEBURG LOOP IMPROVEMENTS PROJECT-Notice is hereby given that Dorchester County will hold two identical public information meetings, and the public is invited to attend one of the two: Tuesday, December 9th from 5:00 p.m. to 7:00 p.m., at Gregg Middle School, 500 Greenwave Blvd., Summerville, SC 29483 or Thursday, December 11th from 5:00 p.m. to 7:00 p.m., at First Baptist Church of Jedburg, 121 Brewer Rd, Summerville, SC 29483. Each meeting will present the same material.

The meetings will be drop-in format, and no formal presentation will be given. The purpose of the meetings is to provide information about the proposed project plans, schedule, and to solicit the public’s feedback. The Orangeburg Loop Project includes widening and intersection improvements on Orangeburg Road (from Dorchester Road to Yerby Road), Mallard Road (from Orangeburg Road to Highway 78), and Jedburg Road (from Highway 78 to the Berkeley County Line) to reduce traffic congestion, improve safety, and accommodate bicyclists and pedestrians. Comments from the public will be accepted for a 30-day period following the public meetings.

To access meeting materials and the online comment form after the in-person meetings, please visit DorchesterTransportation.com or email Transportation@dorchestercountysc.gov.   

Public Meeting 

NOTICE TO CITIZENS OF DORCHESTER COUNTY: Pursuant to the South Carolina Eminent Domain Procedure Act, Section 28- 2-70(c), Code of Laws of South Carolina, 1976, as amended, notice is hereby given that entry by personnel of, or working under contract with, Dorchester County (County) will be made in the area of the road(s) described below for such purposes as topographic surveys, subsurface exploration, environmental related studies and for the gathering of any other data necessary for the planning, design, property acquisition and construction of a roadway improvement project. Surveys for the project will be conducted on the following road(s) as described:

  • S-22 (Orangeburg Road) between Dorchester Road and Salt Meadow Lane, including up to 800 feet in either direction on all intersecting roadways
  • S-58 (East Butternut Road/Mallard Road/Jedburg Road) between Gaura Lane and Berkeley County line, including up to 800 feet in either direction on all intersecting roadways

The project involves road widening and intersection improvements, and improvements to bicycle and pedestrian accommodations. This project is made possible by the Dorchester County Transportation Sales Tax Program. Information about the project may be obtained by contacting Dorchester County at Transportation@dorchestercountysc.gov or visiting https://dorchestertransportation.com/.

Dorchester County Project
IDs: 24TSOL, 24TSYR