The Linger Longer Drive Extension project includes the extension of Linger Longer Drive to tie into Headwaters Drive. This will provide a secondary and signalized access to The Ponds subdivision to improve access and safety.
The blue outline on the map indicates the general vicinity for the transportation project. The boundary is for informational purposes only and does NOT indicate property impacts.
The embedded Power BI Dashboards can be viewed in full screen by clicking the arrow on the bottom right of the BI Dashboard. Press ESC to exit full screen and return to the Home page.
NOTICE TO CITIZENS OF DORCHESTER COUNTY: Pursuant to the South Carolina Eminent Domain Procedure Act, Section 28- 2-70(c), Code of Laws of South Carolina, 1976, as amended, notice is hereby given that entry by personnel of, or working under contract with, Dorchester County (County) will be made in the area of the roads described below for such purposes as topographic surveys, subsurface exploration, environmental related studies and for the gathering of any other data necessary for the planning, design, property acquisition and construction of a roadway improvement project. Surveys for the project will be conducted on the following road(s) as described:
The project involves the construction of a new roadway alignment between Linger Longer Drive and Headwaters Drive. This project is made possible by the Dorchester County Transportation Sales Tax Program. Information about the project may be obtained by contacting Dorchester County at Transportation@dorchestercountysc.gov or visiting https://dorchester transportation.com/. Dorchester County Project ID: 24TSLL